The following companies are certified:
As at 2017-10-26Certifications of companies according to DVGW guideline W 120-1
Company | Scope of certification | Certificate-Reg.-No. | Expiry |
Stölben GmbH
Barlstr. 42
D-56856 Zell |
A3, B1, B3, S1-5 |
600001.500.17253
|
30.09.2022 |
BOG Bohr- und Umwelttechnik GmbH
Eselsteig 17
D-07586 Caschwitz |
A4, B2, B4 |
600052.500.19101 |
19.03.2024 |
Behringer + Dittmann Bohrgesellschaft mbH
Schieräckerstr. 35
D-90431 Nürnberg |
A3, B2, B 5, S3, S4, S5 |
10002.500.14001 |
27.07.2019 |
Certifications of companies according to DVGW guideline W 120-2
Company | Scope of certification | Certificate-Reg.-No. | Expiry |
Behringer + Dittmann Bohrgesellschaft mbH
Schieräckerstr. 35
D-90531 Nürnberg |
G200 |
10002.502.14002 |
27.07.2019 |
Certifications of companies according to EN ISO 22475
Company | Scope of certification | Certificate-Reg.-No. | Expiry |
Stölben_GmbH
Barlstr. 42
D-56856 Zell |
sampling category A (continuously core samples)
installation of piezometers(diameter up to 200 mm) |
600001.501.17251 |
30.09.2022 |
Abbrevitions:Installion of wells
A1 - well diameter larger than DN 400
A2 - well diameter up to DN 400
A3 - well diameter up to DN 300
A4 - well diameter up to DN 150
boreholes
B1 - dry drilling methods deeper than 75 m
B2 - dry drilling mehtods up to a depth of 75 m
B3 - hydraulic circulation drilling methods deeper than 300 m
B4 - hydraulic circulation drilling methods up to a depth of 300 m
B5 - hydraulic circulation drilling methods up to a depth of 100 m
Well regeneration
R1 - mechanical regeneration
R2 - chemical regneration
Restoration and dismantling
S1 - annular space sealing
S2 - insertion casing
S3 - washover/pipe cut
S4 - backfilling/partial backfilling
S5 - dismantling
Geothermal heat excahnges (BHE)
G200 - BHE up to a depth of 200 m